Our Projects:

Grove Park Inn

Job Description:   

 

This high-end resort construction project featured all the bells and whistles. All pools are Saline fully tiled with 1" x 1" tile. Overall the project included 11 bodies of water- men's and women's waterfall spas, men's and women's whirlpools ,men's and women's cold plunges , Indoor lap pool, Indoor leisure pool w/ underwater speakers, indoor double waterfall pool (2 waterfalls with water falling over 30 ft), outdoor pool with heated deck and amazing outdoor waterfall (over 60 ft tall). All equipment was assembled in a controlled facility managed by Hobb Fountains. ADS partnered with William Hobbs of Hobbs architectural fountains, Doug Whitaker of Olson Lavoe and George Bender of Alpine pools.

 

Owner: 

Grove Park Inn - Asheville, NC

 

General Contractor:

JA Jones of Charlotte, NC.

Project manager was Scott Jones

 

Screen Shot 2014-01-06 at 6.58.05 PM.png
Screen Shot 2014-01-06 at 6.58.05 PM.png
press to zoom
Screen Shot 2014-01-06 at 6.57.56 PM.png
Screen Shot 2014-01-06 at 6.57.56 PM.png
press to zoom
Screen Shot 2014-01-06 at 6.58.51 PM.png
Screen Shot 2014-01-06 at 6.58.51 PM.png
press to zoom
Screen Shot 2014-01-06 at 6.58.42 PM.png
Screen Shot 2014-01-06 at 6.58.42 PM.png
press to zoom